What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £95.38 |
| 2 | Immingham CHP | £85.12 |
| 3 | Dinorwig | £83.13 |
| 4 | Spalding | £83.07 |
| 5 | Coryton | £82.53 |
| 6 | Marchwood | £81.00 |
| 7 | Carrington Ltd - 2 | £76.92 |
| Region | £/MWh |
|---|---|
| South Eastern | £65.6 |