What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £1490.00 |
| 2 | Keadby-2 Main | £1131.31 |
| 3 | Marchwood | £723.50 |
| 4 | Immingham CHP | £458.69 |
| 5 | Spalding | £446.50 |