What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Kings Lynn A | £30.39 |
| 2 | Centrica Business Solutions S06B | £28.27 |
| 3 | Great Yarmouth | £26.62 |
| 4 | Unit 2 | £25.91 |
| 5 | Pembroke 11 | £23.60 |
| 6 | Keadby-2 Main | £23.55 |
| 7 | Grain | £20.92 |
| Region | £/MWh |
|---|---|
| South Eastern | £8.3 |