What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £45.38 |
| 2 | Cottam Development Centre | £35.59 |
| 3 | Grain | £35.59 |
| 4 | Medway | £30.61 |
| 5 | SOUTH HUMBER BANK P/S | £28.50 |
| 6 | EDFE Aggregate MANWEB01 | £24.77 |
| 7 | Staythorpe 1 | £24.75 |
| Region | £/MWh |
|---|---|
| Midlands | £17.9 |
| Northern | £17.7 |
| South Western | £17.7 |