What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £47.50 |
| 2 | Staythorpe 2 | £40.71 |
| 3 | Carrington Ltd - 2 | £38.40 |
| 4 | Flexitricity #05 | £37.90 |
| 5 | Blackpool | £37.55 |
| 6 | Flexitricity #05 | £37.32 |
| 7 | Immingham CHP | £36.12 |